Testing
Software Development Process Flow – Testing
This step incorporates the following stages.
Entry Criteria
- Project Management Plan is available.
- Successfully Unit Tested Code is available.
- High Level Design, Low Level Design, and Unit Test Cases are available.
Tasks
- Conduct testing.
- Prepare user documents.
- Inspection of user documents.
- Provide Phase-end Review.
Validation and Verification
- Review functional test results.
- Review User Documentation.
Exit Criteria
- Tested System is released.
- User Documentation is completed.
Phase Deliverables

|